Construction Timeline & Site Status — April 2026

The project is in its new-launch phase. Boundary fencing is complete across the 28.7-acre Velimela site, land leveling is finished and groundwork is under way. The experience centre is operational; foundation work for residential blocks begins after the EOI window closes. RERA filings include quarterly photo updates — verifiable independently of marketing material.

Milestone Current Status Expected Date
Land Leveling Completed Feb 2026
RERA Approval Approved April 2026
Official Launch Launched April 02, 2026
Excavation Starts Scheduled June 2026
Possession Scheduled March 2031

Current Site Update: The boundary wall is 100% complete. The model apartment and sales gallery are now open for private previews for EOI holders.






Prestige Golden Grove Construction Progress Report: Feb 2026



Wide angle view of the main access gate and clear driveway leading into the Prestige Golden Grove premises

Main Access Gate

Exterior perspective of the secured entryway and perimeter fencing at the Prestige Golden Grove development site

Secured Entryway

Panoramic view of ongoing road development and extensive land grading work at the Prestige Golden Grove construction site

Road Development

Detailed view of concrete curbing and drainage channel construction along the internal pathways of Prestige Golden Grove

Drainage Construction

Construction progress at Prestige Golden Grove showing internal road preparation next to a green perimeter boundary net

Site Boundary

Temporary site offices and initial groundwork visible behind the green safety fencing at the Prestige Golden Grove project area

Site Preparations

Stacked concrete paving blocks securely stored on the cleared development land at the Prestige Golden Grove site

Material Storage

On-site contractor cabins and engineering offices set up amidst the preliminary groundwork at Prestige Golden Grove

Engineering Office

Wide expansive view of the cleared and leveled land completely prepared for foundational work at the Prestige Golden Grove property

Land Clearing

Heavy excavator machinery moving dirt and preparing the terrain at the Prestige Golden Grove development site

Earthmoving Work

A heavy-duty cement mixer truck parked on site amidst the ongoing preliminary groundwork at Prestige Golden Grove

Cement Mixing

A large dump truck and excavator working together to transport construction materials at the Prestige Golden Grove site

Material Transport

Earthmoving equipment loading construction debris and soil into a dump truck near large gravel piles at Prestige Golden Grove

Gravel Dumping

Concrete blocks and construction aggregates staged in the foreground while heavy machinery operates in the background at Prestige Golden Grove

Block Staging

Temporary site facilities and engineering cabins positioned on the dry tract of land at the Prestige Golden Grove location

Temporary Facilities

Scraped and leveled ground with small mounds of topsoil indicating early stages of land preparation at Prestige Golden Grove

Ground Leveling

Expansive dry terrain and cleared vegetation showcasing the massive scale of the upcoming Prestige Golden Grove development

Terrain Prep

Sturdy corrugated metal barricades installed with iron frames along the main road to secure the Prestige Golden Grove property

Metal Barricade

Continuous roadside fencing separating the public highway from the internal construction zones of the Prestige Golden Grove project

Roadside Fencing

View from inside the perimeter fence looking out over the currently overgrown grassy sectors of the Prestige Golden Grove land

Boundary Fencing

A quiet section of the property featuring native trees and dry brush slated for future development phases at Prestige Golden Grove

Undeveloped Sector

Close-up view of Alekhya Rise high-rise residential towers under construction in the vicinity of Prestige Golden Grove

Alekhya Rise Towers

Ongoing construction of the Alekhya Rise project highlighting the thriving and expanding real estate neighborhood of Prestige Golden Grove

Alekhya Rise Construction

Street view of the expanding neighborhood featuring the Alekhya Rise project and wide access roads near Prestige Golden Grove

Neighborhood Development

Construction site of Alekhya Homes demonstrating the rapid residential development and growth surrounding Prestige Golden Grove

Alekhya Homes Project

The photographs of Prestige Golden Grove capture the road and controlled access gate leading into the project. The site is being clearly marked with perimeter barricading and fencing. Inside the site, land leveling, internal roadsworks, drainage line installations are visible. Trucks, and neatly arranged construction materials and paving blocks are present. Temporary cabins and engineering offices are set up for site management. These images show a well planned development activity.

Prestige Golden Grove Construction Status is in the new-launch stage. By tracking the progress of construction, buyers have an idea of what stage their project is at and when they can expect to receive possession of their home. All buyers can make informed decisions with clarity and confidence, allowing them to invest in the property. Construction is set to start in 2026, and buyers will receive regular updates on the development of the project and the major milestones achieved.

Prestige Golden Grove is located in Velimela, West Hyderabad. The project offers 2, 3, and 4 BHK units ranging in size from 1169 sq. ft. to 3013 sq. ft. All construction status updates will be shared from time to time, so buyers always know what is happening on the site.

Early investors enjoy special pricing and the first choice of units. During the pre launch phase, buyers can take early bird pricing starting at ₹88 lakhs, with preferred units like lake facing apartments or amenity facing homes available at very attractive entry prices. This phase is the best time to book a home with Prestige Group.

Project Phase and Approvals

The project is developed by Prestige Group. The project was launched on April 02, 2026. Now it is a fully approved project, which ensures the legal documentation and rights.

The phase of Prestige Golden Grove Velimela is already under active construction in some parts, with basement work and the superstructure getting ready. This steady work builds a strong base for the whole Prestige Golden Grove township.

Construction Start and Timeline

Construction works started on April 02, 2026. Now, the project is fully approved by the Telangana RERAAuthority. Major on-site work will start by mid 2026, and the full completion is targeted for 2031. After this, the project will be given in phased possession.

During this stage, early investors can enjoy attractive pricing and priority unit choices, making this period great for booking a home. Prestige Group is known for following all the legal rules. The project will be constructed using the best materials available.

Township Size and Master Plan

The township spreads across 28 acres of prime land in Tellapur, Hyderabad. It includes modern buildings and beautiful homes across 10 high rise towers. These apartments offer big living spaces and world class amenities that make life simple, comfortable, and happy.

There will be 5120 homes in total, in 2 BHK, 3 BHK, and 4 BHK plans. The size of each home ranges from 1169 sq ft to 3013 sq ft. Every home brings a mix of style, comfort, and good planning.

Key Construction Milestones

Below are the main milestones of Prestige Golden Grove:

  • Pre-launch Date: March 15, 2026
  • Launch Date: April 02, 2026
  • Completion Time: Within 5 years from the launch
  • Possession Date: March 31, 2031

These milestones help buyers understand the full timeline of the project and plan their investment better.

On Site Construction Activities

The first phase is to do basement and superstructure work. The work will begin in a step by step manner. These activities make sure the towers rise safely and strongly. The water and sewage pipeline would be set up along the phase. Every stage of construction would be strictly monitored. There will be regular quality inspections.

The construction of model apartments is important. It helps buyers see how a completed unit would look. It shows buyers the materials used and finishes done.

Once all the approvals are done, tower construction, model homes, and internal roads will begin. The team will check the quality at each step to make sure the homes are safe, long lasting, and perfect for families.

Each photo of the construction phase will be updated in the gallery. This ensures buyers stay informed.

Documentation and Handover

After completion, the builder will collect all important legal papers, like:

  • Occupation Certificate (OC)
  • Completion Certificate (CC)
  • Possession Letter

These papers make the handover smooth and help every buyer feel safe and confident. The construction status shows the Prestige Group’s strong commitment to building safe, beautiful, and well planned homes.

Details for the Buyers

Prestige Group’s reputation assures buyers that the construction would be completed in a safe and on-time manner. All the major phases of construction information will be updated to the buyer. The construction will begin phase wise with focus on quality and safety.

Early Stage Investment Advantage

Initially, purchasers will receive an 11% discount on their purchase price. Consequently, those looking to buy early will have a larger range of unit selection, be able to take advantage of lower entry prices, and see better long-term potential growth in Hyderabad's rapidly developing Tellapur region.

Frequently Asked Questions

Prestige Golden Grove is currently in pre launch stage.

The construction will begin by mid 2026.

The expected possession date is 31 March 2031.

A total of 10 high rise towers will be constructed.

Yes, Prestige Group adheres to quality control measures for a safe and durable home at every construction stage.

The buyers will get a Completion Certificate (CC), an Occupation Certificate (OC), and a Possession Letter during the transfer of ownership.

Yes, buyers will be regularly updated on the construction progress.

Who Should Track Construction Progress Closely

High-monitoring needLower-monitoring need
NRI buyers — limited site-visit frequency means quarterly RERA reports and photo updates are the primary check.Buyers within an hour of the site who can visit ad-hoc.
First-time home buyers using bank financing — banks tie tranche release to construction milestones.All-cash buyers with longer holding windows and higher slippage tolerance.
Investors deploying multiple units — milestone slippage compounds across booking commitments.Single-unit end-users with no resale intent until handover.
Buyers with hard occupancy timelines (school admissions, job relocations).Buyers using the unit for capital preservation, not occupancy.

Risk vs Reward — Tracking Pre-Handover

Reward of close monitoringCost / friction
Early visibility of slippage allows fund-flow adjustment well before bank-tranche dates.Time investment — typically 30–60 minutes per quarterly review cycle.
Photo-vs-marketing comparison detects creeping spec changes before agreement modification.Requires a baseline understanding of construction phases.
Active engagement signals to the developer that buyer scrutiny is ongoing — improves response quality.Over-engagement can read as adversarial; calibrate frequency.
Independent verification of escrow utilisation lowers fund-diversion risk.Requires reading bank statements and quarterly RERA filings.

What to Watch in Quarterly Reports

  • Phase progression. Excavation → foundation → tower-1 superstructure → MEP → finishing — each stage has standard timelines.
  • Manpower and machinery on site. Headcount and equipment density indicate execution pace independent of marketing.
  • Concrete pour cycles. A typical Mivan formwork cycle is 7–10 days per slab; slower cycles flag delivery risk.
  • Material staging. On-site staging vs just-in-time delivery indicates supply-chain reliability.
  • External infrastructure progress. Site approach roads, drainage and power infrastructure should advance in parallel.

Brand-Built vs Local-Built — Execution Markers

  • Slab cycle discipline. Branded developers typically maintain 7–10 day Mivan cycles; local execution can stretch to 14–18 days.
  • Scaffolding and safety standards. Branded sites use modular scaffolding and visible PPE compliance; local sites often don't.
  • Material quality at staging. Branded developers stage graded materials with batch labels; local developers often mix grades.
  • Onsite engineering presence. Branded developers staff full-time supervisory engineers; local sites often share supervision across multiple projects.
  • Documentation depth. Quarterly RERA filings from branded developers include photo, work-progress and financial-utilisation detail; local filings often run minimum-compliance.
×