Construction Timeline & Site Status — April 2026
The project is in its new-launch phase. Boundary fencing is complete across the 28.7-acre Velimela site, land leveling is finished and groundwork is under way. The experience centre is operational; foundation work for residential blocks begins after the EOI window closes. RERA filings include quarterly photo updates — verifiable independently of marketing material.
| Milestone | Current Status | Expected Date |
|---|---|---|
| Land Leveling | Completed | Feb 2026 |
| RERA Approval | Approved | April 2026 |
| Official Launch | Launched | April 02, 2026 |
| Excavation Starts | Scheduled | June 2026 |
| Possession | Scheduled | March 2031 |
Current Site Update: The boundary wall is 100% complete. The model apartment and sales gallery are now open for private previews for EOI holders.
Prestige Golden Grove Construction Progress Report: Feb 2026
Main Access Gate
Secured Entryway
Road Development
Drainage Construction
Site Boundary
Site Preparations
Material Storage
Engineering Office
Land Clearing
Earthmoving Work
Cement Mixing
Material Transport
Gravel Dumping
Block Staging
Temporary Facilities
Ground Leveling
Terrain Prep
Metal Barricade
Roadside Fencing
Boundary Fencing
Undeveloped Sector
Alekhya Rise Towers
Alekhya Rise Construction
Neighborhood Development
Alekhya Homes Project
The photographs of Prestige Golden Grove capture the road and controlled access gate leading into the project. The site is being clearly marked with perimeter barricading and fencing. Inside the site, land leveling, internal roadsworks, drainage line installations are visible. Trucks, and neatly arranged construction materials and paving blocks are present. Temporary cabins and engineering offices are set up for site management. These images show a well planned development activity.
Prestige Golden Grove Construction Status is in the new-launch stage. By tracking the progress of construction, buyers have an idea of what stage their project is at and when they can expect to receive possession of their home. All buyers can make informed decisions with clarity and confidence, allowing them to invest in the property. Construction is set to start in 2026, and buyers will receive regular updates on the development of the project and the major milestones achieved.
Prestige Golden Grove is located in Velimela, West Hyderabad. The project offers 2, 3, and 4 BHK units ranging in size from 1169 sq. ft. to 3013 sq. ft. All construction status updates will be shared from time to time, so buyers always know what is happening on the site.
Early investors enjoy special pricing and the first choice of units. During the pre launch phase, buyers can take early bird pricing starting at ₹88 lakhs, with preferred units like lake facing apartments or amenity facing homes available at very attractive entry prices. This phase is the best time to book a home with Prestige Group.
Project Phase and Approvals
The project is developed by Prestige Group. The project was launched on April 02, 2026. Now it is a fully approved project, which ensures the legal documentation and rights.
The phase of Prestige Golden Grove Velimela is already under active construction in some parts, with basement work and the superstructure getting ready. This steady work builds a strong base for the whole Prestige Golden Grove township.
Construction Start and Timeline
Construction works started on April 02, 2026. Now, the project is fully approved by the Telangana RERAAuthority. Major on-site work will start by mid 2026, and the full completion is targeted for 2031. After this, the project will be given in phased possession.
During this stage, early investors can enjoy attractive pricing and priority unit choices, making this period great for booking a home. Prestige Group is known for following all the legal rules. The project will be constructed using the best materials available.
Township Size and Master Plan
The township spreads across 28 acres of prime land in Tellapur, Hyderabad. It includes modern buildings and beautiful homes across 10 high rise towers. These apartments offer big living spaces and world class amenities that make life simple, comfortable, and happy.
There will be 5120 homes in total, in 2 BHK, 3 BHK, and 4 BHK plans. The size of each home ranges from 1169 sq ft to 3013 sq ft. Every home brings a mix of style, comfort, and good planning.
Key Construction Milestones
Below are the main milestones of Prestige Golden Grove:
- Pre-launch Date: March 15, 2026
- Launch Date: April 02, 2026
- Completion Time: Within 5 years from the launch
- Possession Date: March 31, 2031
These milestones help buyers understand the full timeline of the project and plan their investment better.
On Site Construction Activities
The first phase is to do basement and superstructure work. The work will begin in a step by step manner. These activities make sure the towers rise safely and strongly. The water and sewage pipeline would be set up along the phase. Every stage of construction would be strictly monitored. There will be regular quality inspections.
The construction of model apartments is important. It helps buyers see how a completed unit would look. It shows buyers the materials used and finishes done.
Once all the approvals are done, tower construction, model homes, and internal roads will begin. The team will check the quality at each step to make sure the homes are safe, long lasting, and perfect for families.
Each photo of the construction phase will be updated in the gallery. This ensures buyers stay informed.
Documentation and Handover
After completion, the builder will collect all important legal papers, like:
- Occupation Certificate (OC)
- Completion Certificate (CC)
- Possession Letter
These papers make the handover smooth and help every buyer feel safe and confident. The construction status shows the Prestige Group’s strong commitment to building safe, beautiful, and well planned homes.
Details for the Buyers
Prestige Group’s reputation assures buyers that the construction would be completed in a safe and on-time manner. All the major phases of construction information will be updated to the buyer. The construction will begin phase wise with focus on quality and safety.
Early Stage Investment Advantage
Initially, purchasers will receive an 11% discount on their purchase price. Consequently, those looking to buy early will have a larger range of unit selection, be able to take advantage of lower entry prices, and see better long-term potential growth in Hyderabad's rapidly developing Tellapur region.
Frequently Asked Questions
Who Should Track Construction Progress Closely
| High-monitoring need | Lower-monitoring need |
|---|---|
| NRI buyers — limited site-visit frequency means quarterly RERA reports and photo updates are the primary check. | Buyers within an hour of the site who can visit ad-hoc. |
| First-time home buyers using bank financing — banks tie tranche release to construction milestones. | All-cash buyers with longer holding windows and higher slippage tolerance. |
| Investors deploying multiple units — milestone slippage compounds across booking commitments. | Single-unit end-users with no resale intent until handover. |
| Buyers with hard occupancy timelines (school admissions, job relocations). | Buyers using the unit for capital preservation, not occupancy. |
Risk vs Reward — Tracking Pre-Handover
| Reward of close monitoring | Cost / friction |
|---|---|
| Early visibility of slippage allows fund-flow adjustment well before bank-tranche dates. | Time investment — typically 30–60 minutes per quarterly review cycle. |
| Photo-vs-marketing comparison detects creeping spec changes before agreement modification. | Requires a baseline understanding of construction phases. |
| Active engagement signals to the developer that buyer scrutiny is ongoing — improves response quality. | Over-engagement can read as adversarial; calibrate frequency. |
| Independent verification of escrow utilisation lowers fund-diversion risk. | Requires reading bank statements and quarterly RERA filings. |
What to Watch in Quarterly Reports
- Phase progression. Excavation → foundation → tower-1 superstructure → MEP → finishing — each stage has standard timelines.
- Manpower and machinery on site. Headcount and equipment density indicate execution pace independent of marketing.
- Concrete pour cycles. A typical Mivan formwork cycle is 7–10 days per slab; slower cycles flag delivery risk.
- Material staging. On-site staging vs just-in-time delivery indicates supply-chain reliability.
- External infrastructure progress. Site approach roads, drainage and power infrastructure should advance in parallel.
Brand-Built vs Local-Built — Execution Markers
- Slab cycle discipline. Branded developers typically maintain 7–10 day Mivan cycles; local execution can stretch to 14–18 days.
- Scaffolding and safety standards. Branded sites use modular scaffolding and visible PPE compliance; local sites often don't.
- Material quality at staging. Branded developers stage graded materials with batch labels; local developers often mix grades.
- Onsite engineering presence. Branded developers staff full-time supervisory engineers; local sites often share supervision across multiple projects.
- Documentation depth. Quarterly RERA filings from branded developers include photo, work-progress and financial-utilisation detail; local filings often run minimum-compliance.